In 2013 WS Civil Engineering worked alongside Signalling Solutions on the Poole to Wool Project as part of the Re signalling upgrade works.

Throughout the project WS undertook various works including but not limited to:

  • Upgrading the ducting throughout the full length of Poole Station including the installation of x7 inspection chambers and all associated tarmac works.
  • Cable recovery and installation works
  • Minor demolition works
  • Level Crossing upgrades
  • Installation of Earth Mats
  • Installation of concrete Bund walls for HV feeders

Project Value £370K