Nottingham Re-Signalling Project
2012 to 2014
Project Overview
WS Civil Engineering worked alongside Works Infrastructure and Signalling Solutions in 2012 through to 2014, to undertake various aspects of civils work for the Nottingham Station Re-signalling Project.
The entire project involved laying 10km of new track and renewal of 39 points, together with the installation of 143 new signals. Two level crossings were eliminated and two more were converted to CCTV operation.
Project Value £2.1M
WS Civil Engineering were contracted to complete the following:
- Installation of Trough Routes
- Installation of LOC Bases & Surrounds
- Installation of REB Base & Compound
- DNO Bases & Surround
- Installation of UTX & URX
- Full Level Crossing Upgrades to Carlton and Colwick Level Crossings
- Cable Installation & Recovery
- Earthing Works
- Installation of Points Heating Cubicle Bases & Cabinet
- Points Heating Transformer Bases & Transformers Installation
- De-Veg Work
- Access Upgrades
- Tarmac Works
- Installation of Buried Route
- SPT & Driver Walkway Installation
- Installation of Ground Signals & Bases
Gallery